Wednesday, December 1, 2010

Kitchen & Bathroom & Doors & Stairs

1st Dec 2010 > A busy 2-3 weeks...waterproofing was done in the wet areas. The stairs was installed. Kitchen cupboards and benchtop was installed and currently they are installing all doors and door frames. Tiling should start next week...as the cement and sand has been delivered today.

We upgraded the kitchen sink so it is big enough to wash big pots and woks. Love our bench top


Don't really like the basin..but can live with it.



They still need to install the bulk head above the kitchen cupboards

2 comments:

  1. At Stone Solutions we offer you the perfect solution to updating tired, worn or outdated Benchtop with a minimum of fuss and cost.
    Our fabricators are fully certified and we also offer the services of fully licensed plumbers and electricians if needed.
    Sinks, taps and appliances are also part of our service.

    Benchtop Resurfacing Sydney

    ReplyDelete