1st Dec 2010 > A busy 2-3 weeks...waterproofing was done in the wet areas. The stairs was installed. Kitchen cupboards and benchtop was installed and currently they are installing all doors and door frames. Tiling should start next week...as the cement and sand has been delivered today.
We upgraded the kitchen sink so it is big enough to wash big pots and woks. Love our bench top
Don't really like the basin..but can live with it.
They still need to install the bulk head above the kitchen cupboards