Wednesday, December 1, 2010

Kitchen & Bathroom & Doors & Stairs

1st Dec 2010 > A busy 2-3 weeks...waterproofing was done in the wet areas. The stairs was installed. Kitchen cupboards and benchtop was installed and currently they are installing all doors and door frames. Tiling should start next week...as the cement and sand has been delivered today.

We upgraded the kitchen sink so it is big enough to wash big pots and woks. Love our bench top


Don't really like the basin..but can live with it.



They still need to install the bulk head above the kitchen cupboards

Lockup

17th Nov 2010....Woohooo we have lockup !! That means the external doors are all installed and the place is lockup,

Walls are in

The walls was installed on the 12th Nov 2010

Tuesday, November 9, 2010

Igloo Insulation

9th Nov 2010 - I went over to the Igloo on Sunday afternoon to take photographs of every single wall, ceiling....etc so we will have a records of where everything is behind the walls once everything is covered up. The insulation guys come today installing all the wall and ceiling insulation batts.

Wednesday, November 3, 2010

Cabling - Audio Visual | TV | Network | Alarm | Antenna

3rd November 2010 - the cabling guy is on site today installing all the cables for AV, TV, Network and Alarm system and also the antenna. I will be taking some pictures of all the walls once he is all done.

I notice the carpenters has leveled all the walls in the house, via halve cutting the frame and adding extra timbers. I notice one of the steel beams are not aligned :-( it has bricks around it and it is bolted to another steel beam...so I dont think we can fix it. Will have a chat to site boss.

Tuesday, November 2, 2010

Electric Wiring | Carpenters | Frame Inspection

November 2nd 2010. It as been a busy few days. The Carpenters was in today fixing up all the internal woodwork and door frames. The also finish the fascia at the bottom front of house. I just drove by and had a look inside the house and notice ALL the  electrical wiring was done....not sure when they did that.
We also had a frame inspection today...organised by the builders.

Friday, October 29, 2010

Airconditioning Installation

Friday 29th Oct 2010 - the aircon guys are in this morning installing all the vents.

Roof Tilers are back

Thursday 28th Oct 2010 - the roof tilers are back working on the lower front, back and side roof. The did not turn up today to finish the job :-(

Tuesday, October 19, 2010

Roof scaffolds down and bricks cleaned

19th Oct 2010 - A different team came onsite today to remove roof scaffolds and put back the roof tiles where the scaffold was mounted. Also the brick cleaner was in again cleaning the bottom level and also the inside bricks of the garage.

Friday, October 15, 2010

Eaves Painted and Scaffolds moved down

15th Oct 2010 - The scaffolders are in this morning removing all the scaffolds to ground level so the roof guys can install the alfresco roof. The top roof capping  (13th Oct) was all complete and the eaves plus the top downpipes was also painted (14th Oct).

Monday, October 11, 2010

Roof Eaves

Monday 11th Oct 2010 > Top roof is complete just waiting for them too cement down the roof cappings. Hopefully they will start on the lower back roof soon. The carpenters was in today installing the top Roof eaves...all done in one day


Tuesday, October 5, 2010

Timber Flooring

Finally we had some time on the long weekend to look at some timber flooring...still undecided, but we are most likely going with a yellow tone timber...something that is cool and fresh and also it will make the house brighter. A good idea is to look at houses online that is for sale and has the timber floor species you want, it was hard just looking at a patch of timber at the display showrooms.

There are working on our igloo roof

Tuesday 5th Oct 2010 - The roof tilers have started today after the gutters was installed on Saturday 2nd Oct. Sarking will go on first before the roof tiles.

Monday, September 27, 2010

Aerial View of our Igloo

Found a cool website that updates the aerial view of our igloo with a time line > www.nearmap.com

Thursday, September 9, 2010

Bricks - 2nd level

The brickies came back on the 31st August 2010, a week after the scaffolding was put up. They will stay until the job is complete. It is a small team of the Master and his 2 Assistants.

Friday, August 20, 2010

Bricks - more ice bricks + scaffolding

The scaffolding was completed on Thursday 19th August 2010. The plumbers also turned up in the arvo to do some more work on the 2nd level.
More bricks arrived this morning, hopefully the brickies will start next week.....

update - this arvo all the bricks was moved inside the fence :) lucky they did that or on Monday most of it will not be there...

Monday, August 16, 2010

Bricks - ground level complete

Woohooo, just talked to the brickies this morning, the ground level bricks will be completed today and the scaffolding will be put up this Thursday and the top story bricks will be layed....

Thursday, August 12, 2010

Bricks - front of igloo

The bricks are up at the front of four igloo. Abit more bricks to go around the garage and the scaffolding team with come and prep the whole house before the brick layer comes back to start the 2nd story.

Thursday, August 5, 2010

Bricks & Pipes

Thursday 5th August 2010 - I though it is time to take some pics of the gas and water pipes locations before the bricks go up and cover it all. Just for future reference so i know where all the pipes are. I did the same thing with all the drain pipes underground

Gas + Water pipes


A one man brickie...he is doing the whole house...which i think is awesome


The back alfresco is taking shape

Wednesday, August 4, 2010

Brick Layers have started

Monday 2nd August 2010 - Last week our site supervisor said there was a shortage of brick layers and the wait will be at least 4 weeks :( However on Monday he said he found a brickie that can start on our Igloo...very happy :-)
Looking good - the alfresco area, you can see the drain for the outdoor sink

Friday, July 23, 2010

Our Bricks are delivered

Woohoo our igloo bricks are onsite { PGH Poa }

Monday, July 19, 2010

What our igloo will look like

What our cosy igloo will look like {image from Masterton Home}

Saturday, July 17, 2010

Our Igloo Alfresco

Our igloo alfresco :-)

Friday, July 16, 2010

Frames - nearly complete

The frames are nearly complete. Captured this using my i(gloo)phone :)

Monday, July 12, 2010

More Frames

More frames and also the roof was delivered today

Friday, July 9, 2010

Framing has started

The frames are going up.

Wednesday, July 7, 2010

The Facade

The front view of our igloo


Our facade, found another house that has the same facade as ours.

Tuesday, June 22, 2010

Demolition

23rd March 2010 - It was sad seeing our Igloo getting demolished :(


Five days later, our nice level land

The "old" Igloo

After living in our "Old" Igloo for over 12 years we have out grown it with new additions to the family.

Monday, June 21, 2010

Stormwater & Sewage Pipes

Monday 21st June 2010 - the stormwater and sewage pipes are getting installed today.

Igloo Slab

The Igloo slab was completed on the 16th June 2010. This is the view from the back alfresco area.

Our Colours - Roof + Bricks

Roof Tile

Bricks - PGH Poa

Sunday, June 20, 2010

The journey begins....


Welcome to our Cozy Igloo :-) This blog will feature all the excitements and obstacles of building our Cosy Igloo.We will be building the Manhattan 37 from Masterton Homes.